How It Works

How We Turn Your Basement Into a Valuable Living Space

Transforming your basement isn’t just a renovation — it’s an investment in your home’s future. Whether you’re looking to add square footage, improve structural integrity, or increase resale value, our proven process ensures every step is done safely, legally, and efficiently.

With a stronger foundation, added height, better drainage, and clean finishes, your basement becomes more than storage — it becomes a smart return on investment.

Watch Our Process in Action

See exactly how our basement dig-out and remodeling process works — from first inspection to final walkthrough. This short video walks you through each stage of construction, so you know what to expect before we even break ground.

Our Proven Process, Step by Step

Every basement dig-out project follows a carefully planned and time-tested process. We coordinate with engineers, municipalities, and your schedule to deliver on time and within budget.

orig
Site Visit & Estimate
(1–2 Days)

Every successful project starts with a thorough assessment.

⮞ Our team visits your property to inspect existing conditions — checking ceiling height, foundation walls, structural load, access, and soil conditions.

⮞ We’ll also talk with you about your goals — whether you're creating extra living space, a rental unit, or simply increasing height for storage.

⮞ After gathering the necessary details, we provide a clear, written estimate and scope of work.

service4
Engineering & Permits
(2–4 Weeks)

Before any digging begins, the project must be engineered and approved.

⮞ We work with licensed structural engineers to create detailed drawings, underpinning plans, and structural calculations tailored to your property.

⮞ We handle submission of all documents to your local building department, including zoning, excavation permits, structural drawings, and utility clearances.

⮞ Our team coordinates inspections and approvals to make the process stress-free for you.

20181114_142215x1200-1080x675
Shoring & Underpinning
(1–3 Weeks)

This is the core structural phase of the dig-out.

Shoring involves temporarily supporting your foundation and structure so work can be done safely below.

⮞ We use underpinning techniques to carefully excavate and lower the basement floor while reinforcing the existing foundation — typically in sequential stages called “pins.”

⮞ This process increases usable height (often from ~6 ft to 8 ft or more), allowing your basement to meet legal living standards.

ea61f6c31db0789d8ecada83e16f7102
Drainage & Slab Pouring
(3–5 Days)

A dry basement is a usable basement.

⮞ We install or upgrade the interior drainage system (e.g., French drains, sump pumps, or weeping tiles) to manage groundwater and prevent moisture problems.

⮞ Once drainage is in place, we pour a new concrete slab — creating a level, solid, and moisture-resistant floor.

basement-remodeling-1-1354x645
Framing, MEP, & Finishes
(2–6 Weeks)

Now your basement starts to feel like home.

Framing: Walls, rooms, and staircases are built to your layout.

MEP: Mechanical (HVAC), Electrical, and Plumbing systems are installed, inspected, and approved.

Finishes: Insulation, drywall, flooring, lighting, and fixtures are added to make the space move-in ready. Whether you’re building a home office, extra bedrooms, gym, or income-generating rental, this is where your vision comes to life.